ETHIOPIA TELECOM
PROJECT |
| |
Customer
: |
TCIL (Telecommunications
Consultants India Ltd). Enduser: Ethiopia
Telecom. |
| |
Scope
: |
Supply of Nokia
34 Mbit/s (1+1) Protected OLTE system and associated
Multiplexer equipment.
|
| |
Status
: |
Completed
in September, 2006 |
| |
|
12” SUDAN
PIPELINE PROJECT |
| |
Customer
: |
Larsen & Toubro,
ONGC Videsh Limited. Enduser: SPPC, Sudan. |
| |
Scope
: |
Turnkey Scope for
system design engineering, integration of ~ Marconi
SDH STM4, Nokia Primary Multiplex Equipment, EPABX
& VHF Trunk Radio System. Factory Acceptance Testing,
Training, Installation, Testing and Commissioning
of the Transmission & Radio equipment for 12”
Sudan Pipeline Project of SPPC. |
| |
Status
: |
Project completed
November, 2005. |
| |
|
SOHAR & SALALAH
GAS PIPELINE TRANSMISSION SYSTEM PROJECT |
| |
Customer
: |
WWW. Projects
Pty. Ltd. Enduser: Oman Gas Company. |
| |
Scope
: |
Design, Integration,
factory acceptance testing and commissioning of a
STM-1 and Loop Protected PDH Transmission System. |
| |
Status
: |
Completed. |
| |
|
SBV-0 - RAA STM
NETWORK PROJECT
|
| |
Customer
: |
WWW. Projects Pty.
Ltd. Enduser: Qatar Petroleum. |
| |
Scope
: |
Design, Integration,
installation, testing and commissioning of a STM-4
and STM-1 transmission system with associated PDH
equipment. |
| |
Status
: |
Completed
in February, 2003 |
| |
|
NEXTGEN NETWORKS PROJECTS, AUSTRALIA.
|
| |
Customer
: |
CommTel D.N.S., Australia. Enduser : NextGen Networks Pty. Ltd. Australia. |
| |
Scope
: |
Verification &
validation of DWDM based fibre optic transmission
system upto capacity of 2.4 Tbit/s (Terabits) connecting
five Primary nodes at Melbourne, Sydney, Brisbane,
Adelaide & Perth. |
| |
Status
: |
Completed. |
|
|
EASTERN SDH RING & ASSOCIATED
PDH NETWORK PROJECT, QATAR
|
| |
Customer
: |
WWW.
Projects Pty. Ltd. Enduser: Qatar General Petroleum Corporation. |
| |
Scope : |
Design, Integration,
installation, testing and commissioning of a STM-4
and STM-1 transmission system for Eastern Ring Project
along with associated PDH spur routes & 18 GHz
Digital Microwave Radio Links. |
| |
Status
: |
Completed
in January, 2002 |
| |
|
SNOWY MOUNTAINS
PROJECT |
| |
Customer
: |
CommTel , Australia. Enduser: Snowy Mountains Hydroelectric Authority. |
| |
Scope : |
Installation
& Commissioning of 2 Mbit/s PDH equipment for
their existing Telecom Network. |
| |
Status
: |
Completed
in December, 2000 |
| |
|
DUKHAN
STM RING & ASSOCIATED PDH NETWORK PROJECT, QATAR |
| |
Customer
: |
WWW.
Projects Pty. Ltd. Enduser : Qatar General Petroleum Corporation. |
| |
Scope
: |
Design, Integration,
installation, testing and commissioning of a STM-4
and STM-1 transmission system for Dukhan Gas fields
along with associated PDH spur routes. |
| |
Status
: |
Completed
in June, 2000 |
| |
|
Y2K
UPGRADE OF TRANSMISSION MANAGEMENT COMPUTER (NEPAL) |
| |
Customer
: |
Nokia
Limited. Enduser : Nepal Telecommunication Corporation. |
| |
Scope
: |
Services for upgradation
of Transmission Management Computer of NTC to make
it Y2K compliant. |
| |
Status
: |
Completed
in the Month of December, 1999. |
|
|
HUBARA
POWER STATION PROJECT, OMAN |
| |
Customer
: |
WWW.
Projects Pty. Ltd. Enduser : Petroleum Development Oman. |
| |
Scope
: |
System Design,
Integration, Installation, Testing and Commissioning
of a 8 Mbit/s digital transmission system including
termination of optical fibre cables at 2 terminal
ends. |
| |
Status
: |
Completed
in September, 1999 |
| |
|
NIMR
- NIMR WEST PROJECT, OMAN |
| |
Customer
: |
WWW. Projects Pty.
Ltd. Enduser : Petroleum Development Oman. |
| |
Scope
: |
System Design,
Integration, Installation, Testing and Commissioning
of a 2 Mbit/s digital transmission system including
termination of optical fibre cables at 2 terminal
ends. |
| |
Status
: |
Completed
in July, 1999 |
| |
|
AL-NOOR
TO NIMR OFC LINK PROJECT, OMAN |
| |
Customer
: |
WWW.
Projects Pty. Ltd. Enduser : Petroleum Development Oman. |
| |
Scope
: |
Supervision of
installation of ADSS Optical Fibre cable, jointing,
testing and termination along with Installation, Testing
and Commissioning of a 2 Mbit/s digital transmission
2 terminal ends. |
| |
Status
: |
Project
Completed in May, 1999 |
| |
13. |
LNG
UPSTREAM GAS PIPELINE PROJECT, OMAN |
Customer
: |
Olex
Pty Limited. Enduser : Petroleum Development Oman. |
| Scope
: |
Installation,
Testing and Commissioning of 34 Mbit/s optical fibre
based digital transmission system for a 300 kms long
gas pipeline. |
| |
Status
: |
Project
Completed in February, 1999 |
| |
|
|