<%@ Page Language="C#" ContentType="text/html" ResponseEncoding="iso-8859-1" %> Commtel Networks - Project Experience[Oil & Gas]
Commtel Networks

















 


Turnkey Projects   |  Service Projects  |  AMC Projects   |   Product Sales

Turnkey Projects

 1.
EAST-WEST GAS PIPELINE PROJECT
  Customer : Larsen & Toubro Limited. Enduser: Reliance Gas Transportation Infrastructure Ltd.
  Scope :
Turnkey Scope for system design engineering, integration of  ~ 42 WRI SDH STM16, Equipment with Ethernet Delivery and CCTV System including Factory Acceptance Testing, Training, Installation, Testing and Commissioning of the Telecommunication System for RGTIL’s East-West Pipeline Project traveling a distance of ~1400 Kms from Kakinada to Bharuch.
  Status : Project Under Implementation, SDH System FAT Completed in July, 2007.
 
 2.
JAGOTI PITHAMPUR PIPELINE PROJECT
  Customer : Fibcom (India) Limited. Enduser: Gas Authority Of India Limited.
  Scope :
Turnkey Scope for system design engineering, integration of ~ 9 Nokia Primary Multiplex Equipment, Factory Acceptance Testing, Training, Installation, Testing and Commissioning of the multiplex equipment for GAIL's Jagoti - Pithampur Pipeline.
  Status : Project  completed in  May, 2007.
 
 3.
KAILARUS MALANPUR PIPELINE PROJECT
  Customer : Fibcom (India) Limited. Enduser: Gas Authority Of India Limited.
  Scope :
Turnkey Scope for system design engineering, integration of ~ 5 Nokia Primary Multiplex Equipment, Factory Acceptance Testing, Training, Installation, Testing and Commissioning of the multiplex equipment for GAIL's Kailarus – Malanpur Gas Pipeline .
  Status : Project  completed in  May, 2007.
 
 4.
MUNDRA DELHI PIPELINE PROJECT
  Customer : Wuhan Research Institute of China. Enduser: HPCL.
  Scope :
Turnkey Scope for system design engineering, integration of SDH STM-4 and STM-1 Equipment, Nokia Primary Multiplex Equipment, IP Based CCTV System & Video Conferencing System, Factory Acceptance Testing, Training, Installation, Testing and Commissioning of the transmission equipment for 1048 km long Mundra to Delhi Pipeline Project of HPCL.
  Status : Project Under Implementation, likely to be completed by October, 2007.
 
5.
MANGALIYA BIJWASAN PIPELINE PROJECT
  Customer : Wuhan Research Institute of China. Enduser: BPCL.
  Scope :
Turnkey Scope for system design engineering, integration of SDH STM-4 and STM-1 Equipment, Nokia Primary Multiplex Equipment, IP Based CCTV System & Video Conferencing System, Factory Acceptance Testing, Training, Installation, Testing and Commissioning of the transmission equipment for 740 km long Mangaliya to Bijwasan Pipeline Project of BPCL.
  Status : Project Completed September, 2007
 
 6.
TROMBAY-PUNE-SOLAPUR PIPELINE PROJECT
  Customer : Wuhan Research Institute of China Enduser: HPCL.
  Scope :
Turnkey Scope for system design engineering, integration of SDH STM-4 and STM-1 Equipment, Nokia Primary Multiplex Equipment, IP Based CCTV System & Video Conferencing System, Factory Acceptance Testing, Training, Installation, Testing and Commissioning of the transmission equipment for 400 km long Mumbai to Solapur Pipeline Project of HPCL.
  Status : Project Completed September, 2007
 7.
VIJAIPUR-KOTA PIPELINE PROJECT
  Customer : Wuhan Research Institute of China.
Enduser: GAIL India Limited.
  Scope :
Turnkey Scope for system design engineering, integration of SDH STM16 and STM-1 Equipment & Nokia Primary Multiplex Equipment, Factory Acceptance Testing, Training, Installation, Testing and Commissioning of the transmission equipment for Vijaipur to Kota pipeline project of GAIL.
  Status : Project Under Implementation, likely to be completed by October, 2007.
 
8.
LASARIYA-CHITTAURGRAH PIPELINE PROJECT
  Customer : Indian Oil Limited.
  Scope :
Turnkey Scope for system design engineering, integration of ~ Tejas SDH STM1 & Nokia Primary Multiplex Equipment, Factory Acceptance Testing, Training, Installation, Testing and Commissioning of the entire system for Lasariya to Chittaurgarh pipeline project of Indian Oil Limited.
  Status : Project Completed in August, 2007
 
9.
KOYALI-RATLAM-DAHEJ PIPELINE PROJECT
  Customer : Indian Oil Limited
  Scope :
Turnkey Scope for system design engineering, integration of Tejas SDH STM1 & Nokia Primary Multiplex Equipment alongwith IP based CCTV System. Factory Acceptance Testing, Training, Installation, Testing and Commissioning of the entire system for Koyali to Dahej & Koyali to Ratlam Pipeline project of Indian Oil Limited.
  Status : Project Under Implementation, likely to be completed by December, 2007.
 
10.
PRIMARY MULTIPLEX EQUIPMENT FOR NAHARKATIYA - BARAUNI PIPE LINE
  Customer : Tejas Networks Pvt. Ltd. Enduser: Oil India Limited.
  Scope :
Turnkey Scope for system design engineering, integration of ~ 15 Nokia Primary Multiplex Equipment, Factory Acceptance Testing, Training, Installation, Testing and Commissioning of the multiplex equipment for Naharkatiya to Barauni pipeline project of OIL.
  Status : Project completed in  September, 2006.
 
 11.
MICROWAVE COMMUNICATION SYSTEM FOR SMPL
  Customer : Indian Oil Corporation Limited
  Scope :
Redeployment of Viramgam – Sidhpur Microwave Communication System for Salaya-Mathura Pipeline of Indian Oil Corporation Limited.
  Status : Project Completed in March, 2005
 
 12.

VIZAG-BALIADILA PIPELINE PROJECT

  Customer : Hygrade Pallets Limited
  Scope :
Design, Engineering, Supply, Integration, Testing, Installation, Commissioning, & Training of SDH STM-1 Digital Transmission System and Primary Multiplex Equipment for the Vizag-Baliadila Iron Ore Slurry pipeline project of Hygrade.
  Status : Project completed in March, 2006.

 13.

MORA-HAZIRA PIPELINE PROJECT

  Customer : Gujarat State Petronet Limited, Gujarat.
  Scope :
Design, Engineering, Supply, Integration, Testing, Installation, Commissioning, & Training of optical fibre based 2 Mbit/s digital transmission system for the Mora-Hazira Pipeline of GSPL.
  Status : Project Completed in September, 2004.
 
 14.
BARODA-AHMEDABAD-KALOL PIPELINE PROJECT
  Customer : Gujarat State Petronet Limited, Gujarat.
  Scope :
Design, Engineering, Supply, Integration, Testing, Installation, Commissioning, & Training of SDH STM-1 Digital Transmission System and Primary Multiplex Equipment for the Baroda-Ahmedabad-Kalol pipeline project of GSPL.
  Status : Project Completed in March, 2005.
 
 15.
MORA-SAJOD PIPELINE PROJECT
  Customer : Gujarat State Petronet Limited, Gujarat.
  Scope :
Design, Engineering, Supply, Integration, Testing, Installation, Commissioning, & Training of SDH STM-1 Digital Transmission System and Primary Multiplex Equipment for the Mora-Sajod pipeline project of GSPL.
  Status : Project completed in March, 2005.
 
 16.
PRIMARY MULTIPLEX EQUIPMENT FOR CHENNAI - TRICHY - MADURAI PIPE LINE
  Customer : Fibcom (India) Limited. Enduser: Indian Oil Corporation Limited.
  Scope :
Turnkey Scope for system design engineering, integration of ~ 25 Nokia Primary Multiplex Equipment, Factory Acceptance Testing, Training, Installation, Testing and Commissioning of the multiplex equipment for IOCL's Chennai-Trichy-Madurai pipeline.
  Status : Project completed in March, 2006.
 
 17.
PRIMARY MULTIPLEX EQUIPMENT FOR CGPL & SGPL OF GAIL
  Customer : Fibcom (India) Limited. Enduser: GAIL (India) Limited.
  Scope :
Turnkey Scope for system design engineering, integration of ~ 13 Nokia Primary Multiplex Equipment, Factory Acceptance Testing, Training, Installation, Testing and Commissioning of the multiplex equipment for GAIL's Chainsa-Gujarat Pipeline and South Gujarat Pipeline.
  Status : Project Completed in November, 2004.
 
 18.
UPGRADATION OF OFC BASED TELECOM SYSTEM
  Customer : Hindustan Petroleum Corporation Limited
  Scope :
Design, Engineering, Supply, Integration, Testing, Installation, Commissioning, & of Network Management System and Ethernet Network for HPCL's Vizag-Vijayawada-Secunderabad Pipeline telecommunication system.
  Status : Project Completed in March, 2004.
 19.
BHADBHUT - PAGUTHAN - SHERKI PIPELINE PROJECT
  Customer : Invensys India Private Limited.
Enduser: Gujarat State Petronet Limited, Gujarat
  Scope :
Design, Engineering, Supply, Integration, Testing, Installation, Commissioning & Training of SDH STM-1 Digital Transmission System and Primary Multiplex Equipment.(7 Stations)
  Status : Project Completed in September, 2003.
 
20.
PRIMARY MULTIPLEX EQUIPMENT FOR GAIL'S DWDM PHASE-IIB PROJECT (FIBCOM)
  Cusomer : Fibcom (India) Limited. Enduser: GAIL (India) Limited.
  Scope :
Turnkey Scope for system design engineering, integration of ~ 90 Nokia Primary Multiplex Equipment, Factory Acceptance Testing, Training, Installation, Testing and Commissioning of the multiplex equipment for GAIL's Vizag-Secunderabad and Vijaipur-Dahej Pipelines.
  Status : Completed in September, 2004.
 
21.
TELECOMMUNICATION SYSTEM FOR JAMNAGAR - LONI LPG PIPELINE PHASE-II
  Customer : GAIL (India) Limited.
  Scope :
Turnkey Scope for system design engineering, integration of STM-1 system and narrow band access mux, along with supply of Digital PABX System, Installation, Testing and Commissioning of the telecommunication system.
  Status : Completed in March, 2003.
 
22
DWDM SYSTEM IMPLEMENTATION FOR GAIL'S TELECOM PROJECT, PHASE-IIA
  Customer : Nortel Networks. Enduser: GAIL (India) Limited.
  Scope :
System Documentation, Supply of Installation Equipment, Complete TurnkeyResponsibility of DWDM and SDH System Installation, Testing and Commissioning.
  Status : Project Completed in March, 2003.
 
23.
CAIRN - MORA PIPELINE PROJECT
  Customer : GE Fanuc Systems. Enduser: Gujarat State Petronet Limited, Gujarat.
  Scope :
Design, Engineering, Supply, Integration, Testing, Installation, Commissioning, & Training of 2 Mbit/s Narrowband Access Mux equipment with necessary interface unit and accessories.
  Status : Completed in December, 2002.
 
24.

BHADBHUT - PAGUTHAN PIPELINE PROJECT

  Customer : Invensys India Private Limited. Enduser: Gujarat State Petronet Limited,Gujarat.
  Scope :
Design, Engineering, Supply, Integration, Testing, Installation, Commissioning, & Training of 2 Mbit/s Narrowband Access Mux equipment with necessary interface unit and accessories.
  Status : Completed in December, 2002.
 
25.
2 GHZ DIGITAL MICROWAVE RADIO SYSTEM PROJECT
  Customer Oil and Natural Gas Corporation Limited (ONGC)
  Scope :
Radio Engineering Survey, Supply of Primary Mux, Antennas, Cables and other installation materials including installation and commissioning of Nokia DMR 2002 digital microwave radio equipment between ONGC Uran and MOR Mumbai.
  Status : Completed in October, 2002.
26.
DAHEJ - AMBOLI PIPELINE PROJECT
  Cusomer : Invensys India Private Limited.
Enduser: Gujarat State Petronet Limited,Gujarat.
  Scope :
Design, Engineering, Supply, Integration, Testing, Installation, Commissioning, & Training of SDH STM-1 Digital Transmission System and Primary Multiplex Equipment. (4 Hops)
  Status : Completed in October, 2002
 
27.
EXTENSION OF JAMNAGAR - LONI PIPELINE PROJECT, INDIA
  Customer : Gas Authority Of India Limited.
  Scope :
Design, Integration and Complete implementation services of digital transmission system (STM-1) for Spur Links for existing JLPL Pipeline to GAIL Office in Jaipur.
  Status : Completed in February, 2001
 
28.

MORA - UTTARAN PIPELINE PROJECT

  Customer : Invensys India Private Limited.
Enduser: Gujarat State Petronet Limited, Gujarat.
  Scope :
Design, Engineering, Supply, Integration, Testing, Installation, Commissioning, & Training of SDH STM-1 Digital Transmission System and Primary Multiplex Equipment. (2 Hops)
  Status : Project Completed in August, 2002.
 
29.
JAMNAGAR - LONI PIPELINE PROECT, INDIA
  Customer : Nokia Limited.
Enduser : Gas Authority Of India Limited.
  Scope :
Assistance in Design, Integration and Complete implementation servicesof digital transmission system (STM-16 & STM-1) for a 1280 Kms long gas pipeline.
  Status : Project Completed in September, 2001.
 
30.
EXTENSION OF JAMNAGAR - LONI PIPELINE PROJECT, INDIA
  Customer : Gas Authority Of India Limited.
  Scope :
Design, Integration and Complete implementation services of digital transmission system (STM-1) for Spur Links for existing JLPL Pipeline to GAIL Office in Jaipur.  
  Status : Completed in August, 2002
 
31.
COMMISSIONING OF ENTERPRISE WIDE NETWORK
  Customer : Bharat Petroleum Corporation Limited
  Scope : Design, Supply, Installation & Commissioning of Enterprise Wide Networkfor existing pipeline.
  Status : Completed in December, 2000
32.
REPLACEMENT OF EOW TELEPHONES FOR RIIL PIPELINE (INDIA)
  Customer : Reliance Industrial Infrastructure Limited
  Scope :
Supply, Installation, Testing and Commissioning of the EOW units for 2 Mbit/s digital transmission system for CPPL and JNPT Pipelines.
  Status : Completed in the month of February, 2000
 
33.
IPCL - TMC UPGRADATION (INDIA)
  Customer : Indian Petrochemicals Corporation Limited. MGCC Division
  Scope :
Supply, Installation, Testing and Commissioning of NMS/10 PC TMC system for management of 2 Mbit/s optical fibre based digital transmission system.
  Status : System Commissioned in the month of February, 2000.
 
34.
IPCL- HALPG PIPELINE EXTENSION PROJECT, INDIA
  Customer : Indian Petrochemicals Corporation Limited, MGCC
  Scope :
System Design, Integration, Installation, Testing and Commissioning of a 2 Mbit/s digital transmission system including termination of optical fibre cables at 2 terminal ends.
  Status : Project Completed in April, 1999
 
35.
MGCC RADIO LINKS PROJECT, INDIA
  Customer : IPCL, Maharashtra Gas Cracker Complex
  Scope:
Design, supply, install and integration with existing optical fibre based transmission system of a Digital Microwave Radio System (2 GHz) for 2 separate links.
  Staus : Project Completed in December, 1998.
 
36.
VISAKHAPATANAM - VIJAYAWADA PIPELINE PROJECT, INDIA
  Customer : Olex Pty Limited. Enduser : Hindustan Petroleum Corporation Limited.
  Scope:
Design, supply, integration, install and commission a communications system for a 350 km pipeline including 34Mbps PDH equipment, terminations and jointing, PABX and supervision for 19 stations.
  Staus : Project completed in August, 1998
 
37.
MUMBAI - MANMAD PIPELINE PROJECT, INDIA
  Customer : Olex Pty Limited. Enduser : Bharat Petroleum Corporation Limited
  Scope:
Design, supply, integration, install and commission a communications system for a 255 km pipeline including 8 Mbps PDH equipment, terminations and jointing,PABX and supervision for 14 stations.
  Staus : Project completed in July, 1998
38.
KANDLA TO BHATINDA PETROLEUM PRODUCTS COMMUNICATIONS AND PIPELINE MONITORING SYSTEM, INDIA (Olex Project)
  Customer : Indian Oil Corporation Limited
  Scope:
Supply, installation, commissioning and project management of 1,500 km of an optical fibre based communications and pipeline monitoring SCADA system
  Staus : Completed in 1997
 
39.
RELIANCE PETROCHEMICAL BOMBAY EXTENSION, INDIA (Olex Project)
  Customer : Reliance Industrial Infrastructure Limited
  Scope:
Supply, installation, commissioning of a 32 km extension to an existing optical fibre based communications and pipeline monitoring SCADA system.
  Staus : Completed in January, 1994
 
40.
C.P.P.L. PETROLEUM PIPELINE PROJECT, INDIA (Olex Project)
  Customer : Reliance Industries
  Scope:
Design, supply, install and commission of a 2 Mbit/s PDH Transmissionsystem using optical fibre cable and integration with a SCADA system. The pipeline is 70 kms long with a total of 10 stations.
  Staus : Completed in January, 1991

Service Projects

1.
STM-1 SYSTEM CONNECTIVITY OF ALWAR AND AJMER LINKS OFGAIL
  Customer : GAIL (India) Limited.
  Scope :
System design, transportation, supply of installation materials, installation, testing and commissioning of STM-1 Syfonet SDH nodes,including configuration of newly installed nodes at the Network Management Centres of GAIL.
  Status : Completed in November, 2002.
 
2.
BAILADILA - VIZAG SLURRY PIPELINE PROJECT, INDIA
  Customer : HY-Grade Pellets Limited.
  Scope : Consultancy Services for detailed Engineering of Telecom and SCADA Systems.
  Status : Completed in September, 2001
 
3.
COCHIN - COIMBATORE - KARUR PIPELINE PROJECT (Transmission System)
  Customer : Nokia Networks OY.
Enduser : Petronet CCK Ltd.
  Scope :
Design, Integration, Testing, FAT (Factory Acceptance Test)for SDH STM-1 & STM-4 Digital Transmission System along with associated PDH system and documentation.
  Status : Completed in December, 2000
4.
Y2K UPGRADE OF TRANSMISSION MANAGEMENT COMPUTER (INDIA)
Customer :
Bharat Petroleum Corporation Limited.
Scope :
Supply and upgradation services for upgrading the transmission management computer to make it Y2K compliant. 2 TMC's located at Mumbai and Manmad were upgraded.
  Status : Completed in the Month of September, 1999.
 
5.
Y2K UPGRADE OF TRANSMISSION MANAGEMENT COMPUTER (INDIA)
  Cusomer : Hindustan Petroleum Corporation Limited.
  Scope :
Supply and upgradation services for upgrading the transmission management computer to make it Y2K compliant. 2 TMC's located at Vizag and Vijayawada were upgraded.
  Status : Completed in the Month of August, 1999.
 
6.
Y2K UPGRADE OF TRANSMISSION MANAGEMENT COMPUTER (INDIA)
  Customer : Indian Oil Corporation (Panipat and Sanganer)
  Scope :
Supply and upgradation services for upgrading the transmission management computer to make it Y2K compliant. 2 TMC's located at Panipat and Sanganer were upgraded
  Status : Completed in the Month of May, 1999.
 
7.
COCHIN - COIMBATORE - KARUR PIPELINE PROJECT (Fibre Optic Cable Services)
  Customer : Dodsal Limited.
Enduser : Petronet CCK Ltd.
  Scope :
Optical fibre Cable Testing, Jointing, Termination & Commissioning Services. Supply of FTC (Fibre Termination Closure).
  Status : Completed in December, 2001.

AMC Projects

1.
MUMBAI - MANMAD PIPELINE PROJECT (INDIA) - Maintenance Contract
  Customer : Bharat Petroleum Corporation Limited.
  Scope :
Maintenance services for optical fibre based 8 Mbit/s digital transmission system for a 250 kms long oil pipeline.
  Status : Contract valid upto December, 2007
 
 2.
VIZAG-VIJAYAWADA PIPELINE PROJECT (INDIA) - Maintenance Contract
  Customer : Hindustan Petroleum Corporation Limited.
  Scope : Maintenance services for optical fibre based 34 Mbit/s digital transmission system for a 350 kms long oil pipeline.
  Status : Contract valid upto Febuary, 2008
 
 3.

MAHARASHTRA GAS CRACKER COMPLEX (MGCC), INDIA

  Customer : Indian Petrochemicals Corporation Limited
  Scope :
Turnkey Maintenance Contract for 110 Kms long optical fibre based transmission system, including power supply and SCADA system.
  Status : Contract Valid until June, 2008

 4.

OPTICAL FIBRE MAINTENANCE FOR RIIL PIPELINES (INDIA)

  Customer : Reliance Industrial Infrastructure Limited
  Scope : Maintenance services for optical fibre cable jointing and testing for the CPPL and JNPT Pipelines.
  Status : Project completed in December, 2003
 
 5.
MAINTENANCE OF DIGITAL RADIO LINK BETWEEN BANDRA & URAN
  Customer : Oil & Natural Gas Corporation Limited
  Scope :
Maintenance for hardware and software for 2 GHz digital microwave link between Bandra and Uran (3 Hops). Nokia Equipment.
  Status : Contract Valid until October, 2007
 
 6.
AMC FOR COCHIN - COIMBATORE - KARUR PIPELINE PROJECT
  Customer : Petronet CCK Ltd.
  Scope :
Annual Maintenance Contract for Nokia SDH STM-1/4 System and Primary Multiplex equipment installed for Cohin-Coimbatore-Karur pipeline project of Petronet CCK Limited.
  Status : Contract valid until July, 2008
   

Product Sales

1.
SUPPLY OF NOKIA EQUIPMENT SPARES
  Customer :

Petronet CCK Ltd.

  Scope : Supply of Nokia Synfonet SDH Equipment Spares.
  Status : Delivered in the month of October, 2004.
 
2.
SUPPLY OF NOKIA EQUIPMENT SPARES
  Customer :

GAIL (India) Limited.

  Scope : Supply of spares for spares for Nokia digital transmission system (Nokia Equipment)
  Status : Equipment delivered in March, 2004.
 
3.
SUPPLY OF SDH STM-1 EQUIPMENT TO GAIL (INDIA) LIMITED
  Customer :
GAIL (India) Limited.
  Scope :
Supply of Synfonet STM-1 SDH equipment for establishing connectivity of Ajmer, Alwar and Dadri for GAILTEL Phase-I Project.
  Status : Equipment delivered in March, 2003.
4.
SUPPLY OF SPARES FOR KBPL PROJECT (INDIA)
  Cusomer : Indian Oil Corporation Limited.
  Scope : Supply of spares for digital transmission system (Nokia Equipment)
  Status : Delivered in the month of March, 2002.
 
5.
SUPPLY OF SPARES FOR MMPL PROJECT (INDIA)
  Customer : Bharat Petroleum Corporation Limited.
  Scope : Supply of spares for digital transmission system